Factory Assembled Towers

Chermside Shopping Centre, Brisbane, QLD

Chermside Shopping Centre, Brisbane, QLD

Scope: 

Replacement of the pulleys to six AquaCool MSS 175 cooling tower.

Wilmar BioEthanol, Sarina, QLD

Wilmar BioEthanol, Sarina, QLD

Scope: 

Repairs to two BAC RCT counter flow FRP cooling towers. Works included the supply and installation of replacement fill media, supply and installation of inlet louvres, design, fabrication and installation of louvre retainer plates and cleaning of the nozzles with the inlet spray system.

Brisbane International Airport, Brisbane

Brisbane International Airport, Brisbane, QLD

Scope: 

Repairs to  CEP cooling tower. Scope of work included the installation of fan stack stiffening rings to four towers, replacement of bearing box assembly to one tower, repacking of the fill media in one tower, installation of new drift eliminator screen and air inlet louvres to one tower and cleaning of all internal surfaces.

Xstrata Copper, Mt Isa

Xstrata Copper, Mount Isa, QLD

Size: 
75 l/sec
Scope: 

Supply of an induced draft counter flow cooling tower, which was shipped to site in three sections for erection.

Coregas, Paget

Coregas Pty Ltd, Paget, QLD

Size: 
44 l/sec
Scope: 

Supply, installation and commissioning of a factory assembled FRP induced draft counter flow cooling tower. The cooling tower was shipped to site in three sections and assembly completion was undertaken in situ.