Mechanical Pipe Work

Morris Towers, 149 Wickham Terrace, Brisbane, QLD

Morris Towers, 149 Wickham Terrace, Brisbane, QLD

Scope: 

Supply and installation of chilled pipe work to connect two new chillers, chilled water storage tank and two pumps. Works included: connection of Copper Type B pipe work to the two CHWP's in the existing cooling tower area, the buffer tank, the two Carrier Chillers and the three AHU's.

Griffith University, Mt Gravatt

Griffith University, Mt Gravatt, QLD

Scope: 

Supply and installation of chilled water pipe work for the Chiller Upgrade project at Griffith University. Works included upgrade of the existing pump connection pipe work, connection of a new expansion tank, installation of condensate drain lines for all units to termination points and new primary and secondary pumps.

140 Creek St, QLD

140 Creek St, Brisbane, QLD

Scope: 

Pipe work installation for the replacement of three chiller units and pumps. Works included: Draining and disconnection of systems and installation of new condenser and chilled water feed and return pipe work spool pieces with isolation valves, check valves, flex couplings and binder test points

Sheraton, Noosa, QLD

Sheraton, Noosa, QLD

Scope: 

Replacement of two chillers and associated connecting pipe work during a seven day shutdown. Works included: Disconnection of existing pipe work and removal of chillers, installation of condenser water pipe work and chilled water pipe work for all connections and installation of vessel relief valve vent pipe work, new flexible couplings and binder test points.

Centro, Taigum, QLD

Centro, Taigum, QLD

Scope: 

Replacement of Chiller pipe works. Works included disconnection of the CW and CHW pipe work connections from the existing chillers and pumps,  modification of existing chilled water feed and return headers, installation of copper chilled water pipe work and fittings, installation of cooling tower equaliser pipe work and installation of chilled water bypass line and cold water supply pipe work.

61 Mary St

61 Mary Street, Brisbane

Scope: 

Fabrication and installation of pipe work associated with chiller replacement. Works included draining chilled and condenser water system, installation of isolation valves, installation of chilled and condenser water pipe work, new pump flanges and new valves and DP piping.