Orica Yarwun, QLD Replacement of AN2 Cooling Tower. Retro fit new two (2) Cell cooling tower onto existing basin providing 25% increased thermal capacity Photo
Ampol Lytton Refinery, QLD New Main Cooling Tower and replace existing six (6) cell cooling tower complete with pipe work. Construct new six (6) cooling
Wilmar Plane Creek Mill, QLD Refurbishment of the Pritchard Cooling Tower. The project had been developed two to three years prior and included the replacement
Isis Central Sugar Mill, Childers, QLD Strengthening of two remaining cells post collapse of the tower. The Client required all three cells to be operational
Qenos, Botany Bay, NSW Replacement and upgrade of the Alkatuff Plant three (3) Cell Cooling Tower. Retro fit an increased capacity cooling tower for future
Mackay Sugar Limited Racecourse Mill, QLD Installation of a single cell cooling tower on an existing basin of an old Marley 600 series double side
Orica Yarwun, QLD AN1 replacement two (2) cell cooling tower The existing Marley tower had to be demolished and replaced within a 31-day outage To
Orica Yarwun Replacement two (2) Cell tower for the existing BAC double side cross flow. New tower was pre-constructed in sections for a change over
Liberty (One Steel) Newcastle Rod Mil, NSW. Replacement two (2) cell cooling tower on existing basin. Change over was completed within a 19-day outage in
Whether you are after a little inspiration or curious how far our capabilities stretch, we invite you to browse our project showcase. If the solution you are searching for isn’t on display, please reach out so we can discuss your options. We are always up for a challenge.
Orica Yarwun, QLD Replacement of AN2 Cooling Tower. Retro fit new two (2) Cell cooling tower onto existing basin providing 25% increased thermal capacity Photo
Ampol Lytton Refinery, QLD New Main Cooling Tower and replace existing six (6) cell cooling tower complete with pipe work. Construct new six (6) cooling
Wilmar Plane Creek Mill, QLD Refurbishment of the Pritchard Cooling Tower. The project had been developed two to three years prior and included the replacement
Isis Central Sugar Mill, Childers, QLD Strengthening of two remaining cells post collapse of the tower. The Client required all three cells to be operational