Replace three cells of the 18 cell counterflow cooling tower – Methanex NZ
Methanex, Motunui Plant, New Plymouth, New Zealand North Island. Design, engineering, planning and site execution to replace three (3) cells of the 18 cell counterflow
Methanex, Motunui Plant, New Plymouth, New Zealand North Island. Design, engineering, planning and site execution to replace three (3) cells of the 18 cell counterflow
Mercury, Nga Awa Purua Power Station, New Zealand North Island Design, prefabrication and change out of the complete upper structure of a ten (10) cell
Dyno Nobel, Moranbah, QLD Replacement fill media to BCF3642-26-4 after 11 years of operation. The requirement was to restore thermal performance of the two (2)
Incitec Pivot, Gibson Island, QLD. 2020 and 2019 Turnaround work on the five (5) Cell Marley 600 series double sided cross flow tower. Breezewater, through
Glencore Mt Isa Mines Replaced Hot Water Decking to Four (4) Cell Pritchard Cross Flow Tower Breezewater has been systematically repair the Pritchard cooling tower
Mackay Sugar Limited Farleigh Mill, QLD Replacement of Jord cooling tower on existing basin Breezewater provided a replacement three (3) cell FRP counterflow design for
Ixom Botany, NSW Replacement of a timber double side cross cooling tower with new FRP. New tower was 80% pre-constructed adjacent to the plant for
Wilmar, Macknade Mill, QLD Breezewater has been trusted on two occasions to replace the ageing Marley 600 series double sided cross flow towers. In 2014
Mackay Sugar Limited Marian Mill, QLD Replacement of single cell large double sided cross-flow cooling tower. This project was complex due to the close proximity
Orica Yarwun, Cyanide Plant, QLD As part of the 95K Cyanide plant expansion Breezewater were commissioned to design and construct a new two (2) cell
Whether you are after a little inspiration or curious how far our capabilities stretch, we invite you to browse our project showcase. If the solution you are searching for isn’t on display, please reach out so we can discuss your options. We are always up for a challenge.
Orica Yarwun, QLD Replacement of AN2 Cooling Tower. Retro fit new two (2) Cell cooling tower onto existing basin providing 25% increased thermal capacity Photo
Ampol Lytton Refinery, QLD New Main Cooling Tower and replace existing six (6) cell cooling tower complete with pipe work. Construct new six (6) cooling
Wilmar Plane Creek Mill, QLD Refurbishment of the Pritchard Cooling Tower. The project had been developed two to three years prior and included the replacement
Isis Central Sugar Mill, Childers, QLD Strengthening of two remaining cells post collapse of the tower. The Client required all three cells to be operational